into Town; this volume to be increased by the Storage Works in question at some future date when the Colony allows of it.

It is therefore now proposed to erect across the Valley, at the site of what was to have been dam, the high Embankment, a dwarf masonry wall in order to form a settling Pond whence to draw off the contents of the stream into the Conduit tunnel.

Before entering the latter, the water will be passed through a small quage basin furnished with a proper guage, as also with an overflow for the escape of surplus waters.

The Conduit Tunnel will be 2445 Yards in length having an internal diameter of 6 feet and is designed to act as a service tank.

Almost the entire portion will be driven through the solid granite. Where this is the case the heading will be simply cut and dressed off to the dimensions and section of the tunnel, no lining being necessary; should fissures be found they will be carefully stopped off with Cement, but springs of water if met with will be left open and utilized.

The tunnel will have a fall from its Inlet to its outlet of 4 in 2000, and at the latter the water will be received into another small guage basin in order to ascertain whether its volume has increased or diminished in its passage through.

After passing through the Guage the water enters the Conduit, which will be 2 feet wide by 2 feet deep in Cross section. The Conduit is 1356 yards long, and extends to a point shown on the plan where it will join the 18 inch iron main which forms the Syphon between the Conduit end and the service tank in Town, a distance of 600 Yards.

Between the Tunnel Outlet and the Syphon head there is a difference of level of 52 feet 6 inches and the Conduit will therefore have a uniform fall from one end to the other, the gradient being 1 in 68.

Any available hill side feeders will be caught into the Conduit in the manner already suggested by Mr. Rawlinson in his Sketchs prepared last year, and the Conduit will be provided with suitable...

Page 300

Page 301

Edit History

2026-05-21 04:12:15 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
into Town; this volume to be increased by the Storage Works in question at some future date when the Colony allows of it.It is therefore now proposed to erect across the Valley, at the site of what was to have been dam, the high Embankment, a dwarf masonry wall in order to form a settling Pond whence to draw off the contents of the stream into the Conduit tunnel.Before entering the latter, the water will be passed through a small quage basin furnished with a proper guage, as also with an overflow for the escape of surplus waters.The Conduit Tunnel will be 2445 Yards in length having an internal diameter of 6 feet and is designed to act as a service tank.Almost the entire portion will be driven through the solid granite. Where this is the case the heading will be simply cut and dressed off to the dimensions and section of the tunnel, no lining being necessary; should fissures be found they will be carefully stopped off with Cement, but springs of water if met with will be left open and utilized.The tunnel will have a fall from its Inlet to its outlet of 4 in 2000, and at the latter the water will be received into another small guage basin in order to ascertain whether its volume has increased or diminished in its passage through.After passing through the Guage the water enters the Conduit, which will be 2 feet wide by 2 feet deep in Cross section. The Conduit is 1356 yards long, and extends to a point shown on the plan where it will join the 18 inch iron main which forms the Syphon between the Conduit end and the service tank in Town, a distance of 600 Yards.Between the Tunnel Outlet and the Syphon head there is a difference of level of 52 feet 6 inches and the Conduit will therefore have a uniform fall from one end to the other, the gradient being 1 in 68.Any available hill side feeders will be caught into the Conduit in the manner already suggested by Mr. Rawlinson in his Sketchs prepared last year, and the Conduit will be provided with suitable...Page 300Page 301
Baseline (Original)
into Town; this volume to be increased by the Storage Works in question at Somes future date when theJans/If the Colony allow of it.It is thenfore.cxNow proposed to erect across the Valby the site of what was to have been dam, the high Embankment, a dwarf masonry in order to form a settling Bond whence to draw off the contents of the stream into the Conduit tunnel.Before entering the latter, the water will behasin furnished passed through a small quage with a proper guage, as also with on oUA overflow for the excaster of surplus waters.The Conduit Funnel will be 2445 Yards in length having an internal dinmeter of 6 feet and in designed to act as Q service tank.010wellsasکر بار مجھےConduit.Almost the entire portion will be driven through the solid granite. Where this is the case the heading with be simplywill cut and drossed off to the dimensions and section of the tunnel, lining being necessary; should fissures be found they will be carefully stopped aft with Cement, but springs of water if notnoany297The with will be left often and utilized. tunnel will have a fall from it's Inlet to its outlet of 4 in 2000, and at the latter the waterbasin another small guage. will be received into another small in order to ascertain whether it'sandguage, volume has increased or diminished in its passage through.After passing through the Guage the water enters the Conduit, which will be 2 feet wide by 2 feet dess in Cross section. The Conduit is 1356 yards long, and extends to a point the plan where it will join the 18 inch iron main which forms the Syphon between the Conduit end and the service tank in Townshown on a distance of Shoo Yards.Between the Tunneldifference Outlet and the Syphon head there is a اور مجھے کہیں of level of 52 feet 6 inches and the Conduit will therefore have uniforms fall from one and to the other, the gradient being I inby. 68.aut available hilt side feeders with be caught into the Conduit in the ma already suggested by Mr. Rawlinson in his Sketchus perived last (year, and the Conduit will be provideds with suitable.Page300Page 301
2026-05-21 04:12:15 · Baseline
View content

into Town; this volume to be increased by the Storage Works in question at Somes future date when the

Jans

/

If the Colony allow of it.

It is thenfore.

cx

Now

proposed to erect across

the Valby

the site of what was to have been dam, the high Embankment, a dwarf masonry

in order to form a settling Bond whence to draw off the contents of the stream into the Conduit tunnel.

Before entering the latter, the water will be

hasin furnished passed through a small quage

with a proper guage,

as

also with

on oUA

overflow

for the excaster of surplus waters.

The Conduit Funnel will be 2445 Yards

in length having an internal dinmeter of 6 feet

and in

designed

to act as

Q

service tank.

010

wells

as

کر بار مجھے

Conduit. Almost the entire portion will

be driven through the solid granite. Where this is the case the heading with be simply

will

cut and drossed off to the dimensions and section of the tunnel,

lining being necessary; should fissures be found they will be carefully stopped aft with Cement, but springs of water if not

no

any

297

The

with will be left often and utilized. tunnel will have a fall from it's Inlet to its

outlet of 4 in 2000, and at the latter the water

basin another small guage. will be received into another small

in order to ascertain whether it's

and

guage, volume has increased or diminished in its

passage through.

After passing through the Guage the water enters the Conduit, which will be 2 feet wide by 2 feet dess in Cross section. The Conduit is 1356 yards long, and extends to a point

the plan where it will join the 18 inch iron main which forms the Syphon between the Conduit end and the service tank in Town

shown on

a distance of Shoo Yards. Between the Tunnel difference Outlet and the Syphon head there is a

اور مجھے کہیں

of level of 52 feet 6 inches and the Conduit will therefore have uniforms fall from one and to the other, the gradient being I in by. 68. aut available hilt side feeders with be caught into the Conduit in the ma

already suggested by Mr. Rawlinson in his Sketchus perived last

(year,

and the Conduit will be provideds with suitable.